Sectors
9000

CIVIC.
INFRASTRUCTURE.
INDUSTRIAL.

Three portfolios that share crews, a safety regime and a design office, and share almost nothing else about how a week is planned.

CIVIC

CIVIC.

Libraries, schools, sports halls, town offices, swimming pools and the occasional theatre. Buildings paid for once and used by everybody.

Civic work is judged on the day it opens and then again every year for four decades. That changes what is worth spending money on: the roof build-up, the door ironmongery, the acoustic separation between the hall and the reading room. We price a civic scheme on a sixty-year service life and show the client the two versions, because the cheaper one is sometimes genuinely the right answer and should be chosen deliberately.

Procurement here is public, so the tender is a document before it is a price. We keep a team who write them for a living.

Live civic schemes6
Longest framework11 years
Service life we design to60 years
INFRASTRUCTURE

INFRASTRUCTURE.

Rail and road interchanges, bridges, locks, quay walls and flood defence. Work measured in possessions rather than in weeks.

On infrastructure the programme is not ours. It belongs to whoever grants the possession, and it is handed out in fifty-two hour windows months in advance. Everything else follows from that: the amount we prefabricate, the size of the crane, whether a pour is even possible. We plan backwards from the window and rehearse the critical lifts off site, because a window missed is not a delay, it is a whole quarter.

Marine and lock work runs out of Rotterdam, where the plant and the divers are.

Possessions worked last year74
Longest single span built48 m
Bridges and locks delivered31
INDUSTRIAL

INDUSTRIAL.

Process buildings, energy terminals, cleanrooms, warehousing and the foundations that carry machines nobody wants to move twice.

An industrial building is a machine enclosure, and the machine is ordered before the building. So the design is driven by a vibration limit, a tonne of point load or a crane rail tolerance handed to us by a supplier in another country. We work to those first and shape the building around them, and we say plainly when a stated tolerance cannot be achieved in a poured slab rather than discovering it at commissioning.

Eindhoven runs this portfolio and keeps the survey and setting-out kit that millimetre tolerances need.

Process halls completed44
Tightest slab tolerance held2 mm
Largest single pour1 850 m3
Selected work

FOUR OF THE
TWO HUNDRED AND SIXTY.

Each of the four below is here because something about it was hard enough to be worth writing down, rather than because it photographs well at dusk.

Open the projects
27500
ARCSTONEPROJECTS

Design, construction and handover of civic, infrastructure and industrial works in the Netherlands, from three offices, with directly employed engineers and concrete crews.

Start a conversation

Offices

  • Amsterdam
    Meridiaanweg 12, 1043 XN Amsterdam+31 20 000 0140
  • Rotterdam
    Kraankade 7, 3072 AJ Rotterdam+31 10 000 0118
  • Eindhoven
    Kalverstraatweg 88, 5642 CV Eindhoven+31 40 000 0172

Direct

Arcstone Projects is a fictional company. This website is a design concept built by odoo-websites.com to demonstrate what an Odoo website can look like. Every project, dimension, date, figure, certificate, address, telephone number and member of staff shown here is invented. The company does not exist, none of these telephone numbers can be called, and no message sent from this site reaches a real engineer.

Arcstone Projects B.V. arcstone-projects.nl An Odoo website concept by odoo-websites.com